production of Magnetic Level Gauge
production of Magnetic Level Gauge:
You can order the Magnetic Level Gauge but the customer should check all of project specifications and to propose sales department like center-to-center of Level Gauge, Operating Pressure, Operating Temperature and Flow density.
When Azarsam Instrument Company (EYVAZ) has got the information as soon as possible to propose technical and commercial suggestions, and after confirmation this company will start to produce Magnetic Level Gauge.
Pay attention to the point that all the Azarsam production is tested with two approaches:
1- Hydrotest 2-functional test.
After the confirmation from the quality control system should be packed and sent to the customer.
There are two approaches for proposing the technical certificates:
1- General certificate: catalogue, install guide, material certificate, hydro test, dimensional drawing and dimensional test.
In this approach, not only do we not propose the up-to-date certificate but we also propose the certificate that is signed at the beginning of the projects; Like RASF and RMRC.
2- Apply for checking: In this approach, the master should apply for checking of production and study the creditable and up-to-date certificates.
Before taking any action about presenting, a meeting between the company and the end user for introducing the process of Magnetic Level Gauge production (KOM) and the end user introduce third person for considering, and inspection test plan and then starts to product.
You can recognize the below certificate:
1- Vendor Print Index & Schedule (VPIS)
2- Inspection and Test Plan (ITP)
3- Sub Vendor List
4- Dimensional Assembly Drawing (DWG) for Level Gauge
5-Procedure Qualification Record (PQR) & Welding Procedure Specification (WPS)
6-Welder certificate
7-Weld & NDT Map
8-NDT Procedure
9-Material Certificate
10-Hydrostatic test procedure
11-Functional test procedure
11-Hydrotest Report for Level Gauge
12-Data Sheet for Level Gauge
13-Catalog for Level Gauge
14-Maintenance Manual
15-Spare Part list (Spare Part List for Two Years Operation or Spare Part List for Commissioning)
16-Packing List
17-Vendor Data Book Index (VDBI)
18-Vendor Final Data Book (VDB)